MBE / DBE CERTIFIED·UEI TEPBCRGGK7Y9·CAGE 63ZD0·SAM ACTIVE
+1 (609) 750-8860·contact@wangtechnology.com
Excavation for the Gowanus Canal CSO retention tank beside the canal in Brooklyn
PROJECTS / GOWANUS CANAL CSO

Gowanus Canal CSO Retention Facilities

NYC DEP · Brooklyn, NY

OWNER / AGENCY
NYC DEP
LOCATION
Brooklyn, NY
INSTRUMENT TYPES
11 deployed
Project overview

Monitoring construction of underground CSO storage tanks for the Gowanus Canal Superfund remediation.

A heavy civil environmental infrastructure program undertaken by the NYC DEP as part of the EPA-mandated Gowanus Canal Superfund remediation. The project includes constructing massive underground Combined Sewer Overflow (CSO) storage tanks, headhouses, and retention structures designed to capture peak wet-weather runoff and prevent raw sewage discharges into the canal waterway.

Instrumentation & services deployed

11 types
Pre- & Post-Construction Condition Photo Survey
PS
Pre- & Post-Construction Condition Photo Survey
Automated Motorized Total Station
AMTS
Automated Motorized Total Station
Manual Crack Gauge (Tell-Tale)
CG
Manual Crack Gauge (Tell-Tale)
Optical Deformation Target / Monitoring Prism
DMP
Optical Deformation Target / Monitoring Prism
Inclinometer
INC
Inclinometer
In-Place Inclinometer
IPI
In-Place Inclinometer
Manual Survey Point
MSP
Manual Survey Point
Piezometer
PZM
Piezometer
Strain Gauge
SG
Strain Gauge
Utility Monitoring Point
UMP
Utility Monitoring Point
Vibration Monitor
VM
Vibration Monitor

Instrument codes follow the legend on the Projects index. Detailed scopes, contract values, and references available on request.

Get in touch

Let’s talk about your next project. We’re here to help.

Contact Us Request Capability Statement