MBE / DBE CERTIFIED·UEI TEPBCRGGK7Y9·CAGE 63ZD0·SAM ACTIVE
+1 (609) 750-8860·contact@wangtechnology.com
Kensico Reservoir shoreline and shaft site for the Kensico-Eastview Connection tunnel
PROJECTS / KENSICO-EASTVIEW CONNECTION

Kensico-Eastview Connection

NYC DEP · Westchester County, NY

OWNER / AGENCY
NYC DEP
LOCATION
Westchester County, NY
INSTRUMENT TYPES
12 deployed
Project overview

Instrumentation for a two-mile, 500-foot-deep tunnel from Kensico Reservoir to the UV disinfection facility.

A $1.9 billion water supply security project managed by the NYC DEP in Westchester County. The core scope involves constructing a two-mile, 500-foot-deep subterranean tunnel between Kensico Reservoir and the Catskill-Delaware Ultraviolet Light Disinfection Facility, alongside deep shaft construction, shoreline stabilization, and intake chamber upgrades to guarantee operational redundancy for over nine million regional consumers.

Instrumentation & services deployed

12 types
Pre- & Post-Construction Condition Photo Survey
PS
Pre- & Post-Construction Condition Photo Survey
Automated Motorized Total Station
AMTS
Automated Motorized Total Station
Airblast Overpressure Microphone
AOP
Airblast Overpressure Microphone
Manual Crack Gauge (Tell-Tale)
CG
Manual Crack Gauge (Tell-Tale)
Optical Deformation Target / Monitoring Prism
DMP
Optical Deformation Target / Monitoring Prism
In-Place Inclinometer
IPI
In-Place Inclinometer
Manual Survey Point
MSP
Manual Survey Point
Real-Time Sound Level & Acoustic Monitor
NM
Real-Time Sound Level & Acoustic Monitor
Piezometer
PZM
Piezometer
Surface Settlement Point
SSP
Surface Settlement Point
Utility Monitoring Point
UMP
Utility Monitoring Point
Vibration Monitor
VM
Vibration Monitor

Instrument codes follow the legend on the Projects index. Detailed scopes, contract values, and references available on request.

Get in touch

Let’s talk about your next project. We’re here to help.

Contact Us Request Capability Statement