MBE / DBE CERTIFIED·UEI TEPBCRGGK7Y9·CAGE 63ZD0·SAM ACTIVE
+1 (609) 750-8860·contact@wangtechnology.com
Suspension towers and main cables of the Bronx-Whitestone Bridge over the East River
PROJECTS / BRONX-WHITESTONE BRIDGE

Bronx-Whitestone Bridge Modernization

MTA Bridges and Tunnels (TBTA) · Bronx–Queens, NY

OWNER / AGENCY
MTA Bridges and Tunnels (TBTA)
LOCATION
Bronx–Queens, NY
INSTRUMENT TYPES
6 deployed
Project overview

Structural monitoring during orthotropic deck replacement and foundation reinforcement.

A multi-contract structural overhaul managed by MTA Bridges and Tunnels to extend the service life of the historic suspension bridge. The project scope features replacing the suspended span deck with a lightweight orthotropic steel deck, reinforcing anchorage and pier foundations, installing aerodynamic fairings, and modernizing approach roadway bridges.

Instrumentation & services deployed

06 types
Pre- & Post-Construction Condition Photo Survey
PS
Pre- & Post-Construction Condition Photo Survey
Automated Motorized Total Station
AMTS
Automated Motorized Total Station
Automated Crackmeter
ACM
Automated Crackmeter
Optical Deformation Target / Monitoring Prism
DMP
Optical Deformation Target / Monitoring Prism
Tiltmeter
TM
Tiltmeter
Vibration Monitor
VM
Vibration Monitor

Instrument codes follow the legend on the Projects index. Detailed scopes, contract values, and references available on request.

Get in touch

Let’s talk about your next project. We’re here to help.

Contact Us Request Capability Statement