PROJECTS / QUEENS MIDTOWN TUNNEL

Queens Midtown Tunnel Rehabilitation

MTA Bridges and Tunnels (TBTA) · Manhattan–Queens, NY

OWNER / AGENCY
MTA Bridges and Tunnels (TBTA)
LOCATION
Manhattan–Queens, NY
INSTRUMENT TYPES
5 deployed
Project overview

Survey and vibration monitoring during post-Sandy restoration and flood barrier installation in both tubes.

A comprehensive restoration and flood resiliency project managed by MTA Bridges and Tunnels following severe damage from Superstorm Sandy. Work across both vehicular tubes included replacing damaged electrical and ventilation infrastructure, installing subterranean concrete lining repairs, upgrading LED roadway lighting, and implementing permanent flood barriers at tunnel portals to defend against major storm events.

Photograph shown is representative of our tunnels work; project photography to follow.

Instrumentation & services deployed

05 types
Pre- & Post-Construction Condition Photo Survey
PS
Pre- & Post-Construction Condition Photo Survey
Automated Motorized Total Station
AMTS
Automated Motorized Total Station
Optical Deformation Target / Monitoring Prism
DMP
Optical Deformation Target / Monitoring Prism
Tiltmeter
TM
Tiltmeter
Vibration Monitor
VM
Vibration Monitor

Instrument codes follow the legend on the Projects index. Detailed scopes, contract values, and references available on request.