OWNER / AGENCY
MTA Long Island Rail Road
MARKET
Tunnels →LOCATION
Midtown Manhattan, NY
INSTRUMENT TYPES
21 deployed
Project overview
Instrumentation for Grand Central Madison and the LIRR tunnels beneath the East River and Midtown.
East Side Access is a major capital transportation megaproject executed by MTA Construction & Development and Long Island Rail Road to expand regional rail capacity. The initiative encompassed the construction of a 350,000-square-foot subterranean concourse beneath Grand Central Terminal, Grand Central Madison, and miles of soft-ground and hard-rock bored tunnels beneath the East River and Midtown Manhattan to establish direct commuter rail service from Long Island to Manhattan's East Side.
Instrumentation & services deployed
21 types
PS
Pre- & Post-Construction Condition Photo Survey

AMTS
Automated Motorized Total Station

AOP
Airblast Overpressure Microphone

ACM
Automated Crackmeter

CG
Manual Crack Gauge (Tell-Tale)

DMP
Optical Deformation Target / Monitoring Prism

INC
Inclinometer

IPI
In-Place Inclinometer

LC
Load Cell

LLS
Liquid Level Settlement System

MPBX
Multi-Point Borehole Extensometer

MSP
Manual Survey Point

NM
Real-Time Sound Level & Acoustic Monitor

OW
Observation Well

PZM
Piezometer

SG
Strain Gauge

SSP
Surface Settlement Point

TE
Tape Extensometer

TM
Tiltmeter

UMP
Utility Monitoring Point

VM
Vibration Monitor
Instrument codes follow the legend on the Projects index. Detailed scopes, contract values, and references available on request.
Explore further





