Second Avenue Subway station cavern under construction beneath Upper Manhattan
PROJECTS / SECOND AVENUE SUBWAY

Second Avenue Subway

MTA C&D · Upper Manhattan, NY

OWNER / AGENCY
MTA C&D
LOCATION
Upper Manhattan, NY
INSTRUMENT TYPES
12 deployed
Project overview

Deep-rock tunneling, slurry walls and station boxes monitored from 63rd Street through East Harlem.

The Second Avenue Subway expansion is a multi-phase heavy civil infrastructure project managed by MTA Construction & Development to enhance regional transit capacity and alleviate severe congestion along the Lexington Avenue subway line. The project scope encompasses extensive deep-rock tunneling, slurry wall installation, utility relocation, and the construction of modern subterranean station boxes across Upper Manhattan from 63rd Street through East Harlem.

Instrumentation & services deployed

12 types
Pre- & Post-Construction Condition Photo Survey
PS
Pre- & Post-Construction Condition Photo Survey
Automated Motorized Total Station
AMTS
Automated Motorized Total Station
Airblast Overpressure Microphone
AOP
Airblast Overpressure Microphone
Automated Crackmeter
ACM
Automated Crackmeter
Manual Crack Gauge (Tell-Tale)
CG
Manual Crack Gauge (Tell-Tale)
Optical Deformation Target / Monitoring Prism
DMP
Optical Deformation Target / Monitoring Prism
Inclinometer
INC
Inclinometer
Liquid Level Settlement System
LLS
Liquid Level Settlement System
Piezometer
PZM
Piezometer
Tiltmeter
TM
Tiltmeter
Utility Monitoring Point
UMP
Utility Monitoring Point
Vibration Monitor
VM
Vibration Monitor

Instrument codes follow the legend on the Projects index. Detailed scopes, contract values, and references available on request.