MBE / DBE CERTIFIED·UEI TEPBCRGGK7Y9·CAGE 63ZD0·SAM ACTIVE
+1 (609) 750-8860·contact@wangtechnology.com
Cable-stayed towers of the new Kosciuszko Bridge over Newtown Creek
PROJECTS / KOSCIUSZKO BRIDGE REPLACEMENT

Kosciuszko Bridge Replacement

NYSDOT · Newtown Creek, Brooklyn–Queens, NY

OWNER / AGENCY
NYSDOT
LOCATION
Newtown Creek, Brooklyn–Queens, NY
INSTRUMENT TYPES
14 deployed
Project overview

Monitoring replacement of the 1939 truss bridge over Newtown Creek with dual cable-stayed spans.

The Kosciuszko Bridge Replacement is a landmark highway infrastructure project managed by the New York State Department of Transportation (NYSDOT). Replacing an obsolete 1939 truss structure over Newtown Creek with dual modern cable-stayed spans, the project doubled vehicular capacity, integrated dedicated pedestrian and bicycle lanes, and improved traffic flow along the vital I-278 Brooklyn-Queens Expressway corridor.

Instrumentation & services deployed

14 types
Pre- & Post-Construction Condition Photo Survey
PS
Pre- & Post-Construction Condition Photo Survey
Real-Time Air Quality & Dust Monitor
AM
Real-Time Air Quality & Dust Monitor
Automated Motorized Total Station
AMTS
Automated Motorized Total Station
Automated Crackmeter
ACM
Automated Crackmeter
Manual Crack Gauge (Tell-Tale)
CG
Manual Crack Gauge (Tell-Tale)
Optical Deformation Target / Monitoring Prism
DMP
Optical Deformation Target / Monitoring Prism
Inclinometer
INC
Inclinometer
Manual Survey Point
MSP
Manual Survey Point
Real-Time Sound Level & Acoustic Monitor
NM
Real-Time Sound Level & Acoustic Monitor
Piezometer
PZM
Piezometer
Strain Gauge
SG
Strain Gauge
Settlement Plate
SP
Settlement Plate
Tiltmeter
TM
Tiltmeter
Vibration Monitor
VM
Vibration Monitor

Instrument codes follow the legend on the Projects index. Detailed scopes, contract values, and references available on request.

Get in touch

Let’s talk about your next project. We’re here to help.

Contact Us Request Capability Statement