OWNER / AGENCY
NYSDOT
MARKET
Bridges →LOCATION
Newtown Creek, Brooklyn–Queens, NY
INSTRUMENT TYPES
14 deployed
Project overview
Monitoring replacement of the 1939 truss bridge over Newtown Creek with dual cable-stayed spans.
The Kosciuszko Bridge Replacement is a landmark highway infrastructure project managed by the New York State Department of Transportation (NYSDOT). Replacing an obsolete 1939 truss structure over Newtown Creek with dual modern cable-stayed spans, the project doubled vehicular capacity, integrated dedicated pedestrian and bicycle lanes, and improved traffic flow along the vital I-278 Brooklyn-Queens Expressway corridor.
Instrumentation & services deployed
14 types
PS
Pre- & Post-Construction Condition Photo Survey

AM
Real-Time Air Quality & Dust Monitor

AMTS
Automated Motorized Total Station

ACM
Automated Crackmeter

CG
Manual Crack Gauge (Tell-Tale)

DMP
Optical Deformation Target / Monitoring Prism

INC
Inclinometer

MSP
Manual Survey Point

NM
Real-Time Sound Level & Acoustic Monitor

PZM
Piezometer

SG
Strain Gauge

SP
Settlement Plate

TM
Tiltmeter

VM
Vibration Monitor
Instrument codes follow the legend on the Projects index. Detailed scopes, contract values, and references available on request.
Explore further





