MBE / DBE CERTIFIED·UEI TEPBCRGGK7Y9·CAGE 63ZD0·SAM ACTIVE
+1 (609) 750-8860·contact@wangtechnology.com
Deep water tunnel shaft excavation with concrete liner for the NYC DEP
PROJECTS / NYC WATER TUNNEL SHAFT INFRASTRUCTURE

NYC Water Tunnel Shaft Infrastructure

NYC DEP · New York City, NY

OWNER / AGENCY
NYC DEP
LOCATION
New York City, NY
INSTRUMENT TYPES
10 deployed
Project overview

Deep-shaft excavation and ground freezing monitored for City Tunnel No. 3 and Delaware Aqueduct connections.

A major municipal water delivery modernization program executed by the New York City Department of Environmental Protection (DEP) to expand network redundancy. The initiative encompasses deep-shaft excavation, ground freezing, structural liner construction, and surface distribution chamber integration for City Tunnel No. 3 (Stage 2) and Delaware Aqueduct connections, securing long-term drinking water conveyance across the five boroughs.

Instrumentation & services deployed

10 types
Pre- & Post-Construction Condition Photo Survey
PS
Pre- & Post-Construction Condition Photo Survey
Automated Motorized Total Station
AMTS
Automated Motorized Total Station
Airblast Overpressure Microphone
AOP
Airblast Overpressure Microphone
Automated Crackmeter
ACM
Automated Crackmeter
Manual Crack Gauge (Tell-Tale)
CG
Manual Crack Gauge (Tell-Tale)
Optical Deformation Target / Monitoring Prism
DMP
Optical Deformation Target / Monitoring Prism
Inclinometer
INC
Inclinometer
Real-Time Sound Level & Acoustic Monitor
NM
Real-Time Sound Level & Acoustic Monitor
Strain Gauge
SG
Strain Gauge
Vibration Monitor
VM
Vibration Monitor

Instrument codes follow the legend on the Projects index. Detailed scopes, contract values, and references available on request.

Get in touch

Let’s talk about your next project. We’re here to help.

Contact Us Request Capability Statement