Project overview
Deep-rock tunneling and cavern excavation monitored for the 1.5-mile extension to Hudson Yards.
The 7-Line Extension is a municipal transit infrastructure project executed by MTA Construction & Development to extend the Flushing 7 subway line 1.5 miles westward from Times Square to 34th Street and 11th Avenue. The project required deep-rock tunnel boring, large cavern excavations, and the construction of the 34th Street–Hudson Yards station, serving as the transit backbone for the commercial redevelopment of Manhattan’s Far West Side.
Instrumentation & services deployed
13 types
PS
Pre- & Post-Construction Condition Photo Survey

AMTS
Automated Motorized Total Station

AOP
Airblast Overpressure Microphone

ACM
Automated Crackmeter

CG
Manual Crack Gauge (Tell-Tale)

DMP
Optical Deformation Target / Monitoring Prism

INC
Inclinometer

MPBX
Multi-Point Borehole Extensometer

NM
Real-Time Sound Level & Acoustic Monitor

OW
Observation Well

PZM
Piezometer

SSP
Surface Settlement Point

VM
Vibration Monitor
Instrument codes follow the legend on the Projects index. Detailed scopes, contract values, and references available on request.
Explore further